A
122,000 square-foot research and development facility
located in the East Lake Union area of Seattle. Structural
framing for both phases utilized two-way, post-tensioned
flat slabs with drop caps at columns. Exterior
closure was anchored brick veneer on steel studs. Lateral
forces are resisited by CMU and concrete shearwalls.
CPL project. |