$5
million infill project in “Old Bellevue” consisting
of 30 wood-framed apartments on three levels over
a two-level post-tensioned concrete structure enclosing
retail, offices, and 33 parking spaces. Exterior
concrete walls were site cast, tilt-up utilizing
special release details to allow shortening of
the slabs while minimizing shortening cracking. CPL
project. |